Investigating a rise in BGA defects
Equipment: REFLOW-C-01
Example period: Aug 10–25, 2026
Why did the defect rate rise, and which boards need attention?
How the agent investigates
Check the metric
Compare the BGA defect rate with the operation’s 0.35% ceiling to define the investigation.
Compare thermal profiles
Compare peak temperature and time above liquidus for the first 9 boards under V7 and the next 33 after stability was confirmed.
Prioritize inspection
Trace all 42 boards. Flag the 3 initially passed boards from the first group that are awaiting shipment for priority checks.
Prepare the report
Separate observed facts, possible causes, inspection priorities, and the checks still needed.
What the analysis found
All 6 defects occurred in the first 9 boards.
After the changeover to unapproved recipe V7, the first 9 boards exceeded the limits for peak temperature and time above liquidus (TAL). The next 33 met the thermal-profile limits, with no defects recorded.
Three boards that passed inspection still need priority checks.
Three of the first 9 boards passed initial inspection and are awaiting shipment. Their exposure to the out-of-range thermal profile makes them a priority for reinspection before shipment.
What changed?
Compare board thermal profiles for the first 9 under V7 and the next 33, processed after stability was confirmed at 10:10 on August 24.
| Measure | First 9 | Next 33 |
|---|---|---|
| Recipe | V7 | V7 |
| Peak temp (℃) | 259–259.8 | 244–245 |
| TAL (s) | 104–106 | 62–66 |
| Defects | 6 | 0 |
| Boards | 9 | 33 |
Thermal-profile limits: peak temperature at or below 250℃; time above liquidus (TAL) at or below 90 seconds.
Production traced and priority checks
Processed under V7
First 9 · Next 33
- Passed initial inspection
- 36boards Check 3 from the initial group first
- Defects confirmed
- 6boards 2 scrapped · 4 for rework
Trace locations and shipment status for all 42 boards. B-V7-0007–0009 passed initial inspection but experienced the out-of-range thermal profile and are awaiting shipment. Prioritize these 3 for reinspection before shipment.
What still needs checking
Investigate the thermal-profile deviation while continuing to check material and printing effects. A missing pre-production stability record does not prove the check was skipped. Locate the 8 boards recorded as sent to an outside process and follow up on inspection results for the 4 awaiting rework.